Progress Update|XCMG XR360 Rotary Drilling Rig Overhaul is Advancing Steadily
Release Time:
Jul 31,2026
The comprehensive overhaul of the XCMG XR360 rotary drilling rig is progressing efficiently. The assembly of the luffing mechanism has been completed with full compliance to precision and quality standards. The maintenance team is fully prepared for the upcoming core mast installation. With refined and standardized maintenance procedures in place, we are committed to restoring the equipment’s original peak performance to support safe and high-efficiency pile foundation and infrastructure construction.
Precision maintenance is well underway as our comprehensive overhaul of the XCMG XR360 rotary drilling rig advances steadily on schedule.
Following standardized disassembly, thorough inspection and precise reassembly, the luffing mechanism assembly has been fully completed. All components are accurately fitted and installed in strict line with industrial standards, marking a vital milestone in the ongoing overhaul project.
With all preparatory work fully completed, our professional team is ready to launch the key procedure of mast installation. All construction operations follow standardized machinery maintenance specifications to ensure precise assembly, accurate structural calibration and complete hidden danger elimination.
Sticking to strict craftsmanship and full-process quality control, we will continuously complete subsequent installation, commissioning and performance calibration work. The rotary drilling rig will be restored to peak operating condition, providing stable, reliable and high-efficiency equipment support for subsequent pile foundation construction and infrastructure projects.
#XCMG #XR360 #RotaryDrillingRig #EquipmentOverhaul #MachineryMaintenance #InfrastructureEngineering #ConstructionEquipment